In Niskayuna, NY, the Hydra-Stop Insta-Valve 250 allowed the utility to avoid doubling the number of homes affected during future shutdowns and eliminated the risk of widespread service interruption.
Minimizing Disruption and Maximizing Continuity During an Emergency Valve Installation

In a large North Carolina city, the Hydra-Stop Insta-Valve 250 enabled the utility to carry out vital infrastructure repairs with zero disruption to commercial and residential water users.
Safeguarding Neighborhood Service During an Emergency With Valve Insertion

In a large North Carolina city, the Hydra-Stop Insta-Valve 250 enabled uninterrupted water service during an urgent infrastructure issue, which required the repair of an 8-inch water main located on the side of a residential street.
Protecting Critical Operations: Control Point Installation at a Major Military Base

At a Midwest military base, the Hydra-Stop Insta-Valve 250 enabled uninterrupted water service during critical upgrades, preserving mission readiness and protecting essential infrastructure.
Preserving Pressure, Protecting Service: Upgrading Hydrant Infrastructure in Kent County

Hydra-Stop’s insertion valve enabled the safe and timely replacement of the century-old hydrant, securing adequate fire protection for the community into the future. Just as importantly, the operation avoided wide-scale customer disruptions and boil advisories, preserving public confidence in the water system.
No Shutdowns, No Setbacks: The Smart Valve Strategy Behind Englewood’s Water Upgrade

Hydra-Stop’s insertion valve provided site-specific isolation during a pipe replacement initiative without disrupting essential services.