Insta-Valve 20-24 Provides Needed Control for Infrastructure Expansion

Buckeye, AZ — Hydra-Stop’s solution allowed targeted control to connect a million-gallon water tank to a new water treatment center.

The City of Buckeye is a steadily growing suburb of Phoenix, Arizona and required an expansion to their water infrastructure to keep up with their increasing population, which included a new water treatment facility.

The city needed to connect an existing million-gallon water tank — which provides water to around 1,300 residents — to their new facility. Unfortunately, there was not a control point on the 24” pipe connecting the tank to the distribution system. To read their full story, download the project brief.