Linestops with the HSF250 Fitting and the Hydra-Stopper

Linestops with the HSF250 Fitting and the Hydra-Stopper

Install the HSF 250 fitting body. Mount the temporary gate valve, open the temporary gate valve, mount the Hydra-Tapper, make the line tap, close the temporary gate valve, dismount the Hydra-Tapper, mount the Hydra-Stopper, open the temporary gate valve, operate the hyper stopper pump handle, stopper engages and conforms to pipe and stops flow the line. Reverse ram direction to disengage stop, operate pump handle to raise stopper, close the temporary gate valve, dismount the Hydra-Stopper, prepare the completion plug. Mount the Hydra-Tapper, open the temporary gate valve, turn feed screw and install completion plug, pin completion plug in place, back out the feed screw. Dismount the Hydra-Tapper and the temporary gate valve, install the blind flange, the line stop operation is complete.